Support road.cc

Like this site? Help us to make it better.

news

Cyclists' safety highlighted as dog walkers face fines for using long leads near cycle paths

From April, Teignbridge District Council will enforce a new public space protection order requiring dogs walkers to use leads shorter than a metre near cycle paths and highways, or face a fine

Dog walkers in the Devon area of Teignbridge District Council will soon risk on-the-spot fines of £100 if they use leads longer than one metre near cycle paths.

The new rule is part of a public space protection order (PSPO) which will come into force from April and cover some areas next to highways and cycling infrastructure.

Owners who walk their dogs on leads longer than a metre can be fined £100, or face prosecution, with maximum fines reaching £1,000.

The rule does not apply for parks and beaches but is an extension of the Teignbridge District Council PSPO, first introduced in 2019 to tackle irresponsible dog ownership.

The council has pledged to improve signage to communicate the changes to members of the public before it comes into effect in the spring.

Dog walkers will also be required to pick up faeces in public places, carry sufficient poo bags, avoid certain beaches during the summer months, and avoid exclusion areas, such as children's play parks.

Councillor Alistair Dewhirst welcomed the extension of the order, saying: "I think it has worked well so far and we want it to continue."

In 2017, a London cyclist wrote to Mayor Sadiq Khan after suffering slashes to his face, back and clothes due to an "almost invisible" dog lead stretched across a path in Blackheath.

Robert Perkins and the dog's owner were injured by the leash, which he did not see as it was "so thin it was almost invisible and it was so long".

"I am likely not the first cyclist that has been involved in such an incident, and fear I will not be the last," Perkins warned at the time.

"While I realise that the green spaces must be shared by many users, my understanding is that dog owners are legally obliged to keep their dogs under control at all times in public – something which is effectively impossible with the use of these types of leads."

In 2015, a man knocked off his bike by an out-of-control dog on a retractable lead won a £65,000 payout from the animal's owner after it leapt into his path while he was training for a Coast to Coast event.

Anthony Steele was riding in a ten-rider group and rang his bell to warn a group of pedestrians moments before the dog leapt into his path, causing the cyclist to crash and fracturing his skull.

Dan is the road.cc news editor and joined in 2020 having previously written about nearly every other sport under the sun for the Express, and the weird and wonderful world of non-league football for The Non-League Paper. Dan has been at road.cc for four years and mainly writes news and tech articles as well as the occasional feature. He has hopefully kept you entertained on the live blog too.

Never fast enough to take things on the bike too seriously, when he's not working you'll find him exploring the south of England by two wheels at a leisurely weekend pace, or enjoying his favourite Scottish roads when visiting family. Sometimes he'll even load up the bags and ride up the whole way, he's a bit strange like that.

Add new comment

94 comments

Avatar
Steve K replied to TheBillder | 3 years ago
1 like
TheBillder wrote:
Cycloid wrote:

If that's the case I'll make sure I have a C**P on the footpath every time I go out
Sorry - It's tasteless, but I could not resist it!

 

How do you know your excrement is tasteless?

Well, it's funny you should ask...

Avatar
Rendel Harris replied to Bucks Cycle Cammer | 3 years ago
1 like

Bucks Cycle Cammer wrote:

"Dog walkers will also be required to pick up faeces in public places"

As opposed to now where they're permitted to leave it just lying around?

Ridiculously, in some cases they can: on agricultural land, woodland, rural common land, marshland, moors and heaths there is no obligation to clean up, even if your dog drops its load right in the middle of the footpath.

Avatar
ThatBloodyCyclist replied to Bucks Cycle Cammer | 3 years ago
0 likes

In my local park they have dog poo bag dispensers. They thought it would solve the problem. But they are now empty and it didn't stop the faeces being left on the pavement. When there were bags they would be tied up and throw into the bushes.

Avatar
morgoth985 | 3 years ago
5 likes

Hooray!

Pages

Latest Comments